Herringbone · Weybridge

Herringbone from the front door through the ground floor

The client's first thought was to sand the old floor. We priced it, and the old floor came up instead. VitaStyle Pioneer herringbone, pre-finished oak, now runs from the raised entrance at the front door, through the hall and into the rooms off it, for an interior designer's client in Weybridge.

The finished hall in herringbone, running up to the raised entrance and the open front door
Supplied and fitted by AK Hardwood · VitaStyle Pioneer herringbone, colour #143
Floor
VitaStyle Pioneer
Herringbone · colour #143
Blocks
90 × 450 mm
Oak, pre-finished
Area
120 m²
Across the ground floor
Fixing
Fully bonded
Bona R848
Finished

VitaStyle Pioneer herringbone, room to room.

The family room finished in herringbone
The reception room finished in herringbone, looking towards the garden doors
Herringbone running to a wide window over the fields
The downstairs WC with herringbone running through it
The family room, the reception room, the window over the fields, and the downstairs WC.
Sand or replace

Why not sand the old floor?

The old floor was solid oak plank, 240 mm wide, and the client's first thought was to sand and refinish it. We priced that alongside new herringbone so the two could be compared.

Sanding would have kept the boards running the way they did, and that direction didn't lead into the rooms the way the new layout needed. The nosing on the entrance step also stood proud, with a lip overhanging the edge. So the old floor came up.

Sand and refinish Replace with herringbone
The floor The same 240 mm solid oak plank VitaStyle Pioneer herringbone, colour #143, 90 × 450 mm
Direction Unchanged. Sanding doesn't change which way a floor runs Set out from scratch
Step nosing The overhanging lip stays, unless the upper boards are lifted and re-laid, then the whole floor sanded A flush oak nosing, with a 260 mm plank riser
Finish Sanded and refinished in the house Finished at the factory. No sanding on site
The old oak plank floor in the hall, looking towards the stairs
The old oak planks below the entrance step, with the old nosing across the step edge
Close-up of the old step nosing, with its lip overhanging the edge
The old floor: solid oak plank, 240 mm wide, and the old nosing on the entrance step.
From the same doorway

The hall, before and after.

BeforeBefore: the hall through the doorway, on the old 240 mm oak plank floor
DuringDuring: the herringbone down in the hall, with the raised entrance still bare
AfterAfter: the finished hall from the same doorway, herringbone up to the raised entrance
The old plank floor, the herringbone going down, and finished.
The base

Levelled, sealed, then glued down.

With the old floor up, the subfloor was levelled with self-levelling compound (SLC), a cement-based compound that sets into a smooth, flat base. It was then sealed with two coats of Wakol PU280, a liquid damp-proof membrane (DPM) that stops moisture coming up into the wood and the adhesive.

Every block is fully bonded: glued to the subfloor across its whole underside with Bona R848, a hard-elastic adhesive that holds the floor firmly while allowing for the wood's natural movement.

DuringThe first herringbone rows set out on the green DPM, seen through the doorway from the hall
DuringThe herringbone spine reaching the doorway
DuringThe herringbone carried through the doorway into the room
Set out down the middle of the room, then carried through the doorway.
The raised entrance built up and primed, before the herringbone went on top
During · The step built up and primed
The step

A step up at the front door.

Inside the front door, the floor is raised one step above the hall. The step was built up in plywood, primed with a coat of Wakol PU280 so the adhesive bonds to it, and the herringbone continues across the top.

The face of the step is a single run of 260 mm plank in the same finish as the floor. The edge is a flush oak nosing from VitaStyle in three 2.4 m lengths. Their stock is unfinished, so they picked the three lengths closest in shade to each other before staining them to match the floor.

The raised entrance laid in herringbone, with a frame of herringbone blocks round the mat well in front of the front door
After · Herringbone on the step
The mat well

Muddy boots stop at the door.

With fields nearby, boots come in muddy. A coir mat sits in a well in front of the door, framed with herringbone blocks laid end to end, so the inside edge of the frame is cut oak. Anyone wiping their boots on the mat will catch that edge sooner or later, so a flush metal trim runs along it and the knocks land on the metal instead of the wood.

DuringThe mat well in front of the front door, framed in herringbone blocks, before the coir mat went in
The mat well inside the front door, before the coir mat went in.
Questions

About this floor.

Could the old solid oak floor have been sanded instead?
It could have been, and we priced it alongside new herringbone. Sanding wouldn't have changed the direction the boards ran, and that direction didn't lead into the rooms the way the new layout needed. The entrance step's nosing also overhung the edge, so a flush nosing would have meant lifting and re-laying the boards on the upper level before sanding the whole floor.
Can herringbone run over a raised step?
Yes. Here the raised entrance was built up in plywood and primed with Wakol PU280 so the adhesive bonds to it. The herringbone runs across the top, the edge has a flush oak nosing stained to match, and the face of the step is a single run of 260 mm plank in the same finish.
How is the floor protected from muddy boots at the front door?
A coir mat sits in a well inside the front door. The well is framed with herringbone blocks laid end to end, and a flush metal trim runs along the inside edge of the frame, so boots wiped on the mat catch the metal rather than the cut oak edge.
How was the herringbone fixed down?
The old floor was taken up and the subfloor levelled with self-levelling compound, then sealed with two coats of Wakol PU280 as a damp-proof membrane. Every block is fully bonded with Bona R848 adhesive.
Sand or replace?

Talk to us about your floor.

Tell us what's down now and what you're after, and we'll price the options so you can compare them.

Showroom
Unit A/B Investment House
28 Queens Road, Weybridge, Surrey, KT13 9UT
Hours
Mon–Fri 9:00–17:00 · Sat 10:30–15:00
Sun closed